Also completing in mast furler systems repairs and examining all standing rigging. All hydraulic lines to and within mast have been replaced, the furler rod has been given new bearings, the sail has been pulled out and inspected. The winches are being cleaned and greased. The bottom has a fresh coat of Micron Extra. Her Maxprop has been repined. She still needs some deck work estimated at $2000 and there is some rub damage on her port side. This is good time to inspect her and make an offer.
top of page
bottom of page